Below is your Waec 2022 Physics Practical Specimen
-Metre rule
-Knife edge
-A piece of string
-A weighing balance
-A weight hanger
– A set of masses, M = (20g, 40g, 60g, 80g and 100g)
-Deep transparent vessel filled with water
-Vernier calipers
-Standand Masses, m = (2g, 5g and 10g)
-A piece of string
-Forceps (To be used to pick masses placed inside the boiling tube)
-Source of heating
Additional Information:
(a) Test tube or boiling tube of the following dimensions:
Length: at least 14cm
External diameter: 2.5cm
The teacher should:
(b) Use starch to fix a strip of graph sheet marked in centimeters inside the boiling tube or test tube. The 0 centimeter mark of the scale should be at the bottom of the tube.
(c) Place sufficient amount of dry sand or lead shot in the test tube or boiling tube to make it just float, when that is done, pour it into a small polythene and seal it. Push the sealed sand or lead shot to the bottom of the tube.
-Jockey
-2 dry cells(1.5v each) connected in series;
-Connecting leads should be provided for the battery
-Ammeter(0 – 2A)
-Potentiometer
-Key/switch
-Standard resistor, R of resistance 2ohms
-Connecting wires.
FOLLOW US
STUDENT LINKS |
COMMENT SECTION |
COMMENT SECTION |
Below is your Waec 2022 Physics Practical Specimen
-Metre rule
-Knife edge
-A piece of string
-A weighing balance
-A weight hanger
– A set of masses, M = (20g, 40g, 60g, 80g and 100g)
-Deep transparent vessel filled with water
-Vernier calipers
-Standand Masses, m = (2g, 5g and 10g)
-A piece of string
-Forceps (To be used to pick masses placed inside the boiling tube)
-Source of heating
Additional Information:
(a) Test tube or boiling tube of the following dimensions:
Length: at least 14cm
External diameter: 2.5cm
The teacher should:
(b) Use starch to fix a strip of graph sheet marked in centimeters inside the boiling tube or test tube. The 0 centimeter mark of the scale should be at the bottom of the tube.
(c) Place sufficient amount of dry sand or lead shot in the test tube or boiling tube to make it just float, when that is done, pour it into a small polythene and seal it. Push the sealed sand or lead shot to the bottom of the tube.
-Jockey
-2 dry cells(1.5v each) connected in series;
-Connecting leads should be provided for the battery
-Ammeter(0 – 2A)
-Potentiometer
-Key/switch
-Standard resistor, R of resistance 2ohms
-Connecting wires.
FOLLOW US
STUDENT LINKS |
COMMENT SECTION |
COMMENT SECTION |
Is this alternative A or B?
Emeka May 18, 2022 9:27 am
RECENT POSTS |
📗✍️ ABUAD Admission list, 2023/2024 out on JAMB CAPS |
📗✍️ ESUT admission list 2023/2024 now on school’s portal |
📗✍️ GOUNI Admission list, 2023/2024 out on JAMB CAPS |
📗✍️ FCE Zaria NCE Part-time admission form, 2023/2024 |
📗✍️ Neco 2023 June/July Financial Accounting Answers |
ADVERTISEMENT |
Is this alternative A or B?
Emeka May 18, 2022 9:27 am